Articles tagged

#grid code

Philippines solar grid
PPolicy

Philippines Revamps Grid Code to Boost Solar

The Philippines’ 2026 grid code adds standards for solar‑plus‑storage and cuts net‑metering interconnection time from 20 to 10 days, while removing the 1 MW cap, aiming to boost distributed solar capacity.

3 min read
Get in touch

Have a question or a project?

Send us a message — about solar, a story tip, advertising or anything else. We'll get back to you.

We'll only use your details to reply.